Design Fee or Renovation Cost? What You're Actually Paying For

Someone says their condo cost RM90,000. Someone else says RM8,000. Both are telling the truth, and they are answering different questions. Here is which is which.

A living corner with a deep clay-coloured wall, a boucle armchair and a low timber bench
In this guide

    The short version

    Two numbers get quoted for the same project and they are not the same kind of thing at all. One buys thinking. The other buys materials and labour.

    • The design fee is what you pay a designer. Ours is fixed per room — you know it before anything starts.
    • The build cost is what you pay for tiles, carpentry, wiring, furniture and the people fitting them. It is usually four to ten times larger.
    • If you only ever get one number, get the build cost. It is the one that decides whether the project happens.

    Someone tells you their condo cost RM90,000. Someone else says theirs was RM8,000. Both are telling the truth, and they are answering different questions.

    This is the most common confusion we meet, and it is entirely the industry's fault — we quote two numbers, rarely explain which is which, and then wonder why people compare a fee to a build and conclude one of us is mad.

    The two numbers, side by side

    The design fee The build cost
    Who it goes to The designer Contractors, carpenters, suppliers, furniture shops
    What it buys Layout, drawings, materials selection, coordination, someone answering for it when it goes wrong Tiles, paint, cabinetry, wiring, aircon, sanitaryware, sofas, labour
    Rough size RM13,000–27,000 for a three-bedroom condo RM98,000–320,000 for the same home
    When you pay Up front and in stages, before and during design In progress claims as work is done
    How much it varies Barely — it is a function of how many rooms Enormously — finishes, condition and scope all move it

    What that looks like on a real home

    Justin's bedroom, colour-drenched in taupe with layered lighting and a feature wall behind the bed
    Justin's two-bedroom. The build was about RM85,000; the design fee is a different order of number entirely.

    Justin's is a two-bedroom of about 1,000 sq ft. The build — floors, paint, lighting, joinery, furniture, the lot — came to roughly RM85,000.

    The design fee on a home that size is a different order of number. Counting his spaces, it works out at around RM12,000 to style or RM23,000 to design. So the fee is somewhere between a seventh and a quarter of what the build costs, and the two are not remotely interchangeable. The room is here.

    Want both numbers for your own home?

    A few questions about your unit and which rooms you want touched, and we will send the design fee and the build estimate together.

    Get my estimate

    What the design fee actually buys

    It buys decisions, and the drawings that make those decisions buildable. Where the sofa goes and why. Which wall the television is not on. Whether the kitchen island fits once you allow for someone opening the dishwasher. Then the specification — the actual products, finishes and dimensions — and someone holding the contractor to it.

    We charge a flat fee for each room rather than a share of your build: RM1,715 a room to style, RM3,565 a room to design. An open-plan living and dining counts as one space, at RM2,635 or RM5,485. The fee is the same whether you finish that room modestly or expensively.

    That last part matters more than it sounds, and it is the reason we price this way. On a percentage model, the designer's fee grows every time your build does — which means the person advising you to spend more is paid more when you do. We would rather not have that conversation at all. There is more on how the different pricing models compare if you want the detail.

    What the build cost actually is

    Everything else. Hacking, flooring, ceilings, paint, electrical, plumbing, waterproofing, aircon, kitchen and wardrobe carpentry, and the loose furniture that arrives at the end.

    Samples, drawings and a tape measure laid out on a timber table
    The build is everything on this table and everyone who fits it.

    Across Klang Valley condos it lands somewhere between RM120 and RM318 per square foot, and where you sit in that range is mostly about finishes and how much of the developer's work you keep. Carpentry alone is usually around a quarter of it.

    A worked example

    A 900 sq ft condo taken over from the developer. Three bedrooms, an open-plan living and dining, a kitchen and two bathrooms — seven spaces by our count, because the open-plan area is one.

    With styling With full design
    Design fee RM12,925 RM26,875
    Build, at our entry finish level RM123,700 RM123,700
    Total RM136,600 RM150,600

    Now the part most studios would rather not print. On that entry-level build, our design fee works out at 21.7% of the build cost. Step the same home up to our mid finish level and the build becomes about RM252,000 — while the fee does not move at all, because the rooms did not. Suddenly the same fee is 10.7%.

    A fixed fee is a worse deal on a small build and a better one on a large build. That is simply true, and it is the honest trade-off of pricing this way. What you get in exchange is a number that cannot grow while you are not looking, and advice from someone who has nothing to gain from talking you into a nicer worktop.

    Why this matters when you compare quotes

    Three things go wrong when the two numbers get muddled.

    You compare a fee to a build and think one is cheap. A designer quoting RM12,000 and a contractor quoting RM120,000 are not competing. You will very likely pay both.

    You assume a design fee includes the work. It almost never does. Ask plainly: does this number include construction and furniture, or is it your fee alone?

    You forget the fee when you set the budget. If RM100,000 is genuinely all there is, the build has to fit inside RM100,000 minus the fee — not alongside it. Better to know that in week one than in week six.

    Which number should you get first?

    The build cost, always. It is the larger number and the one that decides whether the project is possible. The fee is a rounding error by comparison, and it will not change your mind about anything.

    If you want just the fee — because you already have a contractor, or you only want a room styled — the calculator gives you that in about ten seconds. Count your rooms, pick styling or design, and the number appears. No email required.

    If you want the real answer — fee and build together, for your actual home — that needs a few more questions: size, condition, which rooms, what standard of finish. That is what the estimate is for.

    Get both numbers for your home

    Your rooms, your size, your finish level. The design fee and the build cost, together, in your inbox in about a minute.

    Get my estimate

    Build figures modelled on a 900 sq ft new-handover condominium in the Klang Valley using our own cost model, September 2026. Design fees are our published rates. Neither is a quote.

    If you are weighing up whether you need a designer at all, the comparison with going straight to a contractor is the more useful question. And if you are trying to work out what a given budget stretches to, we have modelled RM100,000 room by room.

    Share WhatsApp Email