Renovation cost index / Kuala Lumpur and Selangor

What it costs to renovate a home in TTDI and Bandar Utama

Two established neighbourhoods either side of the Federal Highway, full of houses their owners have lived in for years. What renovating mature stock actually costs — and why the two behave differently despite sitting minutes apart.

Updated 1 September 2026/7 priced records/TTDI & Bandar Utama, Kuala Lumpur and Selangor
Median rate
RM128 /sq ft
Across 7 priced records in Taman Tun Dr Ismail.
Full spread
RM62–139
Per square foot. The top is 2.2× the bottom.
Median spend
RM300k
Median. Every record sits between RM250k and RM316k.
Sizes covered
1,800–4.8k sq ft
A condominium up to a 4,840 sq ft terrace.

Across 14 published renovation records for Taman Tun Dr Ismail and Bandar Utama, the median cost is RM131 per square foot, or RM300,000 for a whole home. TTDI runs a median of RM128 per square foot; Bandar Utama RM156. The most striking thing in the TTDI data is not the rate but the consistency — every priced record falls between RM250,000 and RM316,000.

14 priced records · Taman Tun Dr Ismail and Bandar Utama · September 2026

Taman Tun Dr Ismail, the trendy spot in KL today

Every figure here is what somebody actually spent — published project records for these addresses, with the floor area they were spent on. Nothing on this page is a quote.

Taman Tun Dr Ismail. Shown by property type and floor area rather than by project name.

DevelopmentBuilt-up (sq ft)Bed / bathSpent per sq ftTotal spent
TTDI Plaza1 record · Taman Tun Dr Ismail · 14 weeks on site1,8003 / 3RM139RM250,000
Sinaran TTDI1 record · Taman Tun Dr Ismail · 10 weeks on site1,8004 / 3RM139RM250,000
The Greens1 record · Taman Tun Dr Ismail · 21 weeks on site2,2454 / 3RM134RM300,000
Terrace landed3 records · Taman Tun Dr Ismail · 12–104 weeks on site2,350–4,8403–7 / 3–6RM62–128RM300k–RM316k
Bungalow landed1 record · Taman Tun Dr Ismail · 36 weeks on site4,0004 / 5RM70RM280,000

The budget barely moves. The house does. Seven priced records, all between RM250,000 and RM316,000 — a RM66,000 spread across homes running from 1,800 to 4,840 square feet. The largest house in the set was renovated at the lowest rate per square foot, over 104 weeks. That is what renovating to a figure rather than to a rate looks like, and it is worth knowing before you set your own.

Bandar Utama, counted separately

Minutes away across the Federal Highway, and in Selangor rather than Kuala Lumpur. Bandar Utama runs a higher median rate and a far wider spread than TTDI — the range here is nearly five times from bottom to top.

Median rate
RM156 /sq ft
Across 7 priced records.
Full spread
RM53–247
Per square foot. The top is 4.7× the bottom.
Median spend
RM370k
Median. The range runs RM85k to RM630k.
Records
7
All seven state both a budget and a floor area.

Bandar Utama, including the Bukit Utama addresses. Shown by property type and floor area rather than by project name.

DevelopmentBuilt-up (sq ft)Bed / bathSpent per sq ftTotal spent
Utamara1 record · Bandar Utama · 16 weeks on site1,5003 / 2RM247RM370,000
Terrace landed3 records · Bandar Utama · 8–16 weeks on site2,100–3,8004 / 3–4RM80–214RM200k–RM630k
Bukit Utama 91 record · Bandar Utama · 14 weeks on site2,5005 / 5RM156RM390,000
Townhouse landed1 record · Bandar Utama · 5 weeks on site1,5503 / 4RM55RM85,000
1 Bukit Utama1 record · Bandar Utama · 8 weeks on site1,900—RM53RM100,000

The landed homes cost less per square foot than the condominiums — a median of RM92 against RM139, which is the reverse of most Kuala Lumpur addresses. In neighbourhoods this established, much of the recorded landed work is partial: opening up an older layout, rewiring, replumbing. The condominium work is more often a full fit-out of a newer, smaller unit, and full fit-outs cost more per foot than partial ones every time.

Four ways interior designers charge

Before you compare two quotes, work out which of these each one is. Three of the four move while your project is running.

Per square foot

Charged on your floor area
You are billed for space, whether or not it is being touched. A store room and a kitchen cost the same per foot, though one takes a day and the other takes a month.Bigger home, bigger fee.

A percentage of the build

Charged on your contractor's total
The design fee is set as a share of what gets spent. Choose the better stone and the fee rises with it, without any more design being done.You spend more, they earn more.

One turnkey number

Charged on everything, combined
Design, build and margin arrive as a single figure. There is no line showing what the design itself cost, so there is nothing to compare against anyone else.You cannot see what you paid for.
What we do

A fixed fee per room

Charged on the rooms you want designed
Agreed before we start. It does not move when your budget moves, when you upgrade the stone, or when the contractor comes back higher than you hoped. Contractor works are quoted separately at cost, with no mark-up and no percentage of your build.You know the number on day one.

Sundays in Bed

Same rooms. Any size. Same fee.

We are a residential interior design studio in Kuala Lumpur, and we charge a fixed fee for each room you want designed. Not a rate per square foot. Not a share of your build. A number you know before anything starts.

On mature stock that matters more than usual. Older houses give up surprises — wiring that has to come out, a wall that turns out to be doing work, a floor level that was never quite right. Those surprises change what your contractor charges you, at cost. They do not change what we charge you.

One layout — four bedrooms, three bathrooms, one open-plan living area — at four sizes. The fee never moves. The rate per square foot falls to a third.

HomeRooms pricedOur design feePer sq ft
Two rooms are always free. When a home has a bedroom and an open-plan living area, we design the foyer and the utility yard at no charge. They are part of how a home works, not extras to bill for.

Price your own home

Choose your building. Set the size and the rooms. This runs the same model we use in the studio — in your browser, sending nothing anywhere.

Our design fee
Drag anything you like. The three ranges move. The fee does not.

Want this run on your actual home?

Tell us your rooms, your level and your budget. You will get the same three ranges back — and an honest answer about which one your budget really reaches.

Get your fixed quote
A Sundays in Bed interior

Questions people ask

How much does it cost to renovate a house in TTDI or Bandar Utama?

Across 14 published records with both a budget and a floor area, the median is RM131 per square foot and RM300,000 for a whole home. TTDI runs a median of RM128 per square foot, Bandar Utama RM156. The two neighbourhoods behave quite differently despite sitting minutes apart.

Why is the TTDI spend so consistent?

Every priced TTDI record in this set falls between RM250,000 and RM316,000 — a RM66,000 spread across homes from 1,800 to 4,840 square feet. The budget barely moves while the house nearly triples. It suggests people here renovate to a figure rather than to a rate, and let the scope follow.

Why do the terraces cost less per square foot than the condominiums?

Landed homes here run a median of RM92 per square foot against RM139 for condominiums, which is the opposite of most areas. These are established neighbourhoods with mature housing stock, and much of the recorded landed work is partial — opening up a 1970s or 1990s layout rather than fitting out an empty shell.

How does Sundays in Bed charge?

A fixed fee per room, agreed before work begins. It does not move with your budget, your finish level, or the contractor's quote. Contractor works are quoted separately at cost, with no mark-up and no percentage of your build.

How long will the house be unusable?

The records here run from 5 weeks to 104, median 16. The long ones are older terraces being substantially rebuilt — the 104-week project was the largest house in the set at the lowest rate per square foot. On mature stock, programme length is driven by what you find behind the walls, not by floor area.

How this was built

  1. The recorded figures. 7 published project records for TTDI & Bandar Utama, each with both a stated renovation budget and a stated built-up area. 14 of them name their development, so only those appear in the table. The headline medians come from the 7 that are fit-outs priced as interior design alone. Every figure is as published — nothing rounded, inferred or filled in.
  2. What they include. These are self-reported by the firms that did the work, and the scope is not consistent between them. Some fold loose furniture into the total. A few bundle structural and architectural work, which lifts them above a straight fit-out. Read any single figure as indicative, not audited.
  3. Our own figures. Our design fee comes from the same costing engine as our quote tool, and the contractor-works ranges in the calculator come from published rate bands for paint, flooring, kitchen, wardrobes, electrical, plumbing and loose furnishing. Where we show our own completed projects, those are our records, not estimates.
  4. What a real quote would add. Ceiling height. Hacking and structural work. Waterproofing. Management rules on working hours and lift access. How much of the developer's original finish survives. None of that sits in a per-square-foot average, and all of it moves a real number.
  5. Why sample size is printed on every row. 7 priced records for TTDI & Bandar Utama proper is a thin sample, and only one address has more than one project behind it. Enough to place the market; not enough to quote an address-level rate, so we do not.
How to cite thisSundays in Bed, TTDI & Bandar Utama Renovation Cost Index, September 2026. https://mysundaysinbed.com/pages/ttdi-bandar-utama-renovation-cost

Sundays in Bed is a residential interior design studio in Kuala Lumpur. We publish this because renovation pricing in this market is unusually opaque, and because we would rather you walked into a first meeting already knowing roughly what your home costs.

Figures are indicative and current as at 1 September 2026. They are not a quotation.